Here is the remaining. I have added one to the front though. I hope by the beginning of September to have 1-4 done.
- Paint all doors
- Repaint main bathroom, I dislike the color I originally painted it
- Install tile floors in main bathroom
- Install new toilet in bathroom
- Finish rehabilitating the original molding of the living and dining room
- Finish the staircase
- Replace upstairs windows
- Refinish downstairs hardwood floors
- Move cold air return so that the original pocket doors can be installed
- Replace downstairs windows
- Get new sliding patio door for the kitchen
- Paint dining room
- Get new siding